0

Out of 0 Ratings

Owner's of the Broan Blower NuTone gave it a score of 0 out of 5. Here's how the scores stacked up:
  • Reliability

    0 out of 5
  • Durability

    0 out of 5
  • Maintenance

    0 out of 5
  • Performance

    0 out of 5
  • Ease of Use

    0 out of 5
of 12
 
3
1. Remove the cover and screws.
2. Attach an appropriate U.L. approved cable connector
in the hole at the rear of the wiring box.
3. Remove roofing nails from shingles around the TOP and
SIDES of the cutout area only.Carefully lift the shingles
to allow the back flashing sheet on the blower housing
to fit under them.
4. Center the blower ring in the 11" diameter hole, making
sure that the 1¼" diameter electrical wiring hole aligns
with the hole in the wiring box.
5. Attach the blower to the roof with six (6) screws
provided. It is recommended that the screws be located
inside the blower housing. Drill pilot holes if necessary.
6. Using a good grade of roofing cement, seal all of the
shingles around the housing and flashing sheet as well
as the mounting screw heads.
7. Bring electrical wiring through the hole in the wiring box
and secure it according to local codes.
8. Make the electrical connections with the proper connec-
tor for the type of wiring being used. Connect black to blue,
white to brown, and the green or bare wire to grounding
screw.
9. Replace cover and screws. Do not pinch wiring under the
cover.
10. Make sure damper opens and closes freely.
1. Place a large bead of caulk on the back side of the
housing all along the outer edges.
2. Center the blower ring in the 11" diameter hole, making
sure that the 1¼" diameter electrical wiring hole aligns
with the hole in the wiring box.
3. Attach blower to the wall with the six (6) screws
provided. It is recommended that the screws be located
inside the blower housing. Drill pilot holes if necessary.
4. Using a good grade of caulk, seal all around the
mounting screw heads.
5. Bring electrical wiring through the hole in the wiring box
and secure it according to local codes.
INSTALL THE BLOWER
ROOF INSTALLATIONS
INSTALL THE BLOWER
WALL INSTALLATIONS
BLACK
TO
BLUE
120 VAC
LINE
IN
WHITE
TO
BROWN
GROUND
TO
GROUNDING
SCREW
BLACK
TO
BLUE
120 VAC
LINE
IN
WHITE
TO
BROWN
GROUND
TO
GROUNDING
SCREW
6. Make the electrical connections with the proper connec-
tor for the type of wire being used. Connect black to blue,
white to brown, and green or bare wire to grounding
screw.
7. Replace cover and screws. Do not pinch wiring under
cover.
8. Make sure damper opens and closes freely.
9. Top and side flanges of the back plate may be covered
with trim strips. Do not block grille opening at bot-
tom with trim. It will adversely affect performance of the
blower.